Muir of Ord
Live arrivals at Muir of Ord on Friday 20 November 2026.
Train times from Muir of Ord: routes, operators and station facilities
Station Information
Muir of Ord is a station served by ScotRail. Allow 5 minutes to change trains here.
Step-free access to some platforms. Check the National Rail step-free guide for full details.
How reliable is this station?
Of the 735 services that called at Muir of Ord over the last 30 days, 51.7% ran on time, 42.2% arrived 2 or more minutes late, and 6.1% were cancelled. The worst recent day was 11 Nov, when 89% of 26 services were delayed. Live cancellations, platform changes, and short-notice delays update in the board above; the 30-day figures are updated nightly from National Rail Darwin data.
How we measure thisCheck a specific route and departure time with the historic punctuality tool.
Which operators run through here?
ScotRail is the only operator serving Muir of Ord.
Where do trains from Muir of Ord go?
The most common direct destinations from Muir of Ord are Inverness (around ~13 trains per day), Beauly and Dingwall. 8 direct routes are published from this station, covering most major UK cities. The live board above shows every departure; use the search to filter by destination.
Current disruption affecting this station
There are no current disruption messages for Muir of Ord. If a problem develops during your journey, Railly surfaces the same station messages National Rail shows in its app. Refresh the board to see updates.
Accessibility at Muir of Ord
Muir of Ord has partial step-free access (category B) and is unstaffed at most times. Help points are available on every platform. A bus stops are within a short walk. National Rail's Passenger Assist service can book assistance on any train from this station. We recommend booking at least 2 hours before travel.
Address
Popular journeys from Muir of Ord
Facilities
Information desk hours
Mon, Tue, Wed, Thu, Fri, Sat, Sun, Pub
Connections
Accessibility
Step-free and accessible travel
This is a Category B1 station. Level to platform 1, ramp to platform 2 and connecting footbridge with stairs.