Skip to content

Alton → West Byfleet

From
To
See if you're owed money for delays on this route

Live train times from Alton to West Byfleet, with around 28 direct services per day and a fastest typical journey of 42m. Operated by South Western Railway. Currently 96.2% of services are running on time today.

South Western Railway
First train
05:39
Last train
22:43
Fastest
42m
~28services per day

Based on the last 25 days of timetable data

00040812162023
Peak: 14:00 (~3/hr)

Today's performance

26 services
25 on time · 1 delayed · 0 cancelled

24-day performance

668 services
345 on time · 290 delayed · 33 cancelled
Worst: 24 Oct (82.4% delayed)Best: 14 Nov (91.2% on time)
Based on 668 services over 24 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Alton to West Byfleet are non-stop on the fastest services, taking 00:42. Most services call at one or two of Farnham, Ash Vale, Brookwood. Some services extend to Woking, Aldershot, London Waterloo, Surbiton, Clapham Junction, Bentley (Hampshire). Slow services (00:54 typical) stop at up to 10 intermediate stations.

Which operator is most reliable on this route?

South Western Railway runs all direct services from Alton to West Byfleet. Over the last 30 days, 70.4% of South Western Railway's services on this route ran on time, with an average delay of 1.3 minutes and a cancellation rate of 1.2%.

Why take the train?

The straight-line distance from Alton to West Byfleet is around 24 miles. By train the journey takes 00:42; the equivalent drive is typically 1h 18m to 1h 37m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.3 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 6.5 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

South Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. South Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 05:39 and the last at 22:43. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Alton