Skip to content

Barrow-in-Furness → Roose

From
To
See if you're owed money for delays on this route

Live train times from Barrow-in-Furness to Roose, with around 19 direct services per day and a fastest typical journey of 4m. Operated by Northern. Currently 100% of services are running on time today.

Northern
First train
05:50
Last train
21:46
Fastest
4m
~19services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 06–07:00 (~2/hr) · 10:00 (~2/hr) · 18:00 (~2/hr)

Today's performance

15 services
15 on time · 0 delayed · 0 cancelled

30-day performance

569 services
482 on time · 66 delayed · 21 cancelled
Worst: 24 Oct (25% delayed)Best: 25 Oct (8.3% on time)
Based on 569 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Barrow-in-Furness to Roose are non-stop on the fastest services, taking 00:04. Most services call at one or two of Arnside, Carnforth, Dalton. Some services extend to Grange-over-Sands, Lancaster, Ulverston, Silverdale, Cark, Kents Bank, Preston, Manchester Piccadilly, Chorley, Deansgate, Gatley, Manchester Oxford Road, Manchester Airport, Bolton, Askam, Foxfield, Millom. Slow services (00:04 typical) stop at up to 20 intermediate stations.

Which operator is most reliable on this route?

Northern runs all direct services from Barrow-in-Furness to Roose. Over the last 30 days, 87.1% of Northern's services on this route ran on time, with an average delay of 1.4 minutes and a cancellation rate of 3%.

Why take the train?

The straight-line distance from Barrow-in-Furness to Roose is around 1 miles. By train the journey takes 00:04; the equivalent drive is typically 33m to 34m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.4 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Northern
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Northern operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 05:50 and the last at 21:46. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Barrow-in-Furness