Skip to content

Bourne End → Marlow

From
To
See if you're owed money for delays on this route

Live train times from Bourne End to Marlow, with around 23 direct services per day and a fastest typical journey of 7m. Operated by Great Western Railway. Currently 100% of services are running on time today.

Great Western Railway
First train
00:05
Last train
23:55
Fastest
7m
~23services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 06–08:00 (~2/hr) · 16:00 (~2/hr) · 18–20:00 (~2/hr)

Today's performance

2 services
2 on time · 0 delayed · 0 cancelled

30-day performance

699 services
573 on time · 65 delayed · 61 cancelled
Worst: 15 Nov (50% delayed)Best: 27 Oct (92.3% on time)
Based on 699 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Bourne End to Marlow are non-stop on the fastest services, taking 00:07. Most services call at one or two of Cookham, Furze Platt, Maidenhead. Slow services (00:10 typical) stop at up to 3 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs all direct services from Bourne End to Marlow. Over the last 30 days, 87% of Great Western Railway's services on this route ran on time, with an average delay of 0.2 minutes and a cancellation rate of 0.6%.

Why take the train?

The straight-line distance from Bourne End to Marlow is around 2 miles. By train the journey takes 00:07; the equivalent drive is typically 35m to 37m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.7 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Great Western Railway services from Bourne End to Marlow can be busy around 20:00. Avoid the 20:00 peak if you can. The 00:00–04:00 services are typically 28% less crowded. Off-peak return tickets are valid on any train after 09:30 on weekdays, all day weekends. The first train is at 00:05 and the last at 23:55. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Bourne End