Skip to content

Bristol Parkway → Gloucester

From
To
See if you're owed money for delays on this route

Live train times from Bristol Parkway to Gloucester, with around 30 direct services per day and a fastest typical journey of 28m. Operated by Great Western Railway and CrossCountry. Currently 100% of services are running on time today.

Great Western RailwayCrossCountry
First train
00:20
Last train
23:25
Fastest
28m
~30services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 09–19:00 (~2/hr)

Today's performance

15 services
15 on time · 0 delayed · 0 cancelled

30-day performance

926 services
600 on time · 276 delayed · 50 cancelled
Worst: 14 Nov (59.4% delayed)Best: 1 Nov (80% on time)
Based on 926 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Bristol Parkway to Gloucester are non-stop on the fastest services, taking 00:28. Most services call at one or two of Reading, Swindon, London Paddington. Some services extend to Didcot Parkway. Slow services (01:40 typical) stop at up to 7 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs the majority of direct services from Bristol Parkway to Gloucester. Over the last 30 days, 67% of Great Western Railway's services on this route ran on time, with an average delay of 1.6 minutes and a cancellation rate of 6.5%. CrossCountry sees lower on-time performance (67%) but runs fewer services.

Why take the train?

The straight-line distance from Bristol Parkway to Gloucester is around 28 miles. By train the journey takes 00:28; the equivalent drive is typically 1h 25m to 1h 48m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.6 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 7.5 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
CrossCountry
30–59 min: 50%60+ min: 100%

DR30 operators only pay out from 30+ minutes.

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 00:20 and the last at 23:25. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Bristol Parkway