Skip to content

Boston → Skegness

From
To
See if you're owed money for delays on this route

Live train times from Boston to Skegness, with around 15 direct services per day and a fastest typical journey of 35m. Operated by East Midlands Railway. Currently 100% of services are running on time today.

East Midlands Railway
First train
06:23
Last train
20:59
Fastest
35m
~15services per day

Based on the last 31 days of timetable data

00040812162023

Today's performance

9 services
9 on time · 0 delayed · 0 cancelled

30-day performance

445 services
211 on time · 212 delayed · 22 cancelled
Worst: 25 Oct (90.9% delayed)Best: 15 Nov (72.2% on time)
Based on 445 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Boston to Skegness are non-stop on the fastest services, taking 00:35. Most services call at one or two of Aslockton, Ancaster, Bingham. Some services extend to Grantham, Heckington, Nottingham, Rauceby, Sleaford, Wainfleet. Slow services (00:48 typical) stop at up to 9 intermediate stations.

Which operator is most reliable on this route?

East Midlands Railway runs all direct services from Boston to Skegness. Over the last 30 days, 52.8% of East Midlands Railway's services on this route ran on time, with an average delay of 3.3 minutes and a cancellation rate of 8.3%.

Why take the train?

The straight-line distance from Boston to Skegness is around 19 miles. By train the journey takes 00:35; the equivalent drive is typically 1h 08m to 1h 23m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 5.2 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

East Midlands Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. East Midlands Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

East Midlands Railway services from Boston to Skegness can be busy around 09:00. Avoid the 09:00 peak if you can. The 00:00–04:00 services are typically 28% less crowded. Off-peak return tickets are valid on any train after 09:30 on weekdays, all day weekends. The first train is at 06:23 and the last at 20:59. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Boston