Skip to content

Cheltenham Spa → Bristol Parkway

From
To
See if you're owed money for delays on this route

Live train times from Cheltenham Spa to Bristol Parkway, with around 41 direct services per day and a fastest typical journey of 29m. Operated by Great Western Railway and CrossCountry. Currently 41.7% of services are running on time today.

Great Western RailwayCrossCountry
First train
06:14
Last train
23:45
Fastest
29m
~41services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 08–17:00 (~3/hr) · 19:00 (~3/hr)

Today's performance

12 services
5 on time · 7 delayed · 0 cancelled

30-day performance

1229 services
365 on time · 791 delayed · 73 cancelled
Worst: 23 Oct (81.8% delayed)Best: 15 Nov (44.8% on time)
Based on 1,229 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Cheltenham Spa to Bristol Parkway are non-stop on the fastest services, taking 00:29. Most services call at one or two of Gloucester, Stonehouse, Swindon. Some services extend to Kemble, Stroud, Chepstow, Severn Tunnel Junction, Lydney, Newport (South Wales), Caldicot, Cardiff Central, London Paddington, Reading, Didcot Parkway. Slow services (01:33 typical) stop at up to 18 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs the majority of direct services from Cheltenham Spa to Bristol Parkway. Over the last 30 days, 33.8% of Great Western Railway's services on this route ran on time, with an average delay of 7.8 minutes and a cancellation rate of 10.7%. CrossCountry sees lower on-time performance (33.8%) but runs fewer services.

Why take the train?

The straight-line distance from Cheltenham Spa to Bristol Parkway is around 33 miles. By train the journey takes 00:29; the equivalent drive is typically 1h 36m to 2h 02m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.8 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 8.9 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
CrossCountry
30–59 min: 50%60+ min: 100%

DR30 operators only pay out from 30+ minutes.

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:14 and the last at 23:45. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Cheltenham Spa