Skip to content

Dorridge → Kidderminster

From
To
See if you're owed money for delays on this route

Live train times from Dorridge to Kidderminster, with around 32 direct services per day and a fastest typical journey of 1h 3m. Operated by LNR & WMR. Currently 96.2% of services are running on time today.

LNR & WMR
First train
05:33
Last train
22:03
Fastest
1h 3m
~32services per day

Based on the last 27 days of timetable data

00040812162023
Peak: 07–19:00 (~2/hr)

Today's performance

26 services
25 on time · 1 delayed · 0 cancelled

26-day performance

828 services
432 on time · 369 delayed · 27 cancelled
Worst: 3 Nov (87.5% delayed)Best: 19 Nov (78.1% on time)
Based on 828 services over 26 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Dorridge to Kidderminster are non-stop on the fastest services, taking 01:03. Most services call at one or two of Widney Manor, Acocks Green, Birmingham Moor Street. Some services extend to Smethwick Galton Bridge, Cradley Heath, Jewellery Quarter, The Hawthorns, Rowley Regis, Stourbridge Junction, Tyseley, Droitwich Spa, Hagley, Blakedown, Worcester Shrub Hill, Worcester Foregate Street. Slow services (01:10 typical) stop at up to 20 intermediate stations.

Which operator is most reliable on this route?

LNR & WMR runs all direct services from Dorridge to Kidderminster. Over the last 30 days, 49.7% of LNR & WMR's services on this route ran on time, with an average delay of 1.9 minutes and a cancellation rate of 7.3%.

Why take the train?

The straight-line distance from Dorridge to Kidderminster is around 21 miles. By train the journey takes 01:03; the equivalent drive is typically 1h 11m to 1h 28m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.2 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 5.6 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

LNR & WMR
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. West Midlands Trains (LNR & WMR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 05:33 and the last at 22:03. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Dorridge