Skip to content

Epsom Downs → Banstead

From
To
See if you're owed money for delays on this route

Live train times from Epsom Downs to Banstead, with around 33 direct services per day and a fastest typical journey of 3m. Operated by Southern. Currently 72.7% of services are running on time today.

Southern
First train
06:38
Last train
23:48
Fastest
3m
~33services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 07–13:00 (~2/hr) · 15–23:00 (~2/hr)

Today's performance

11 services
8 on time · 1 delayed · 2 cancelled

30-day performance

992 services
863 on time · 104 delayed · 25 cancelled
Worst: 31 Oct (60.6% delayed)Best: 29 Oct (100% on time)
Based on 992 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Epsom Downs to Banstead are non-stop on the fastest services, taking 00:03. Most services call at one or two of Sutton (London), Carshalton Beeches, Belmont. Some services extend to West Croydon, Waddon, Wallington, Thornton Heath, London Victoria, Battersea Park, Wandsworth Common, Balham, Clapham Junction, Norbury, Streatham Common, Selhurst. Slow services (00:04 typical) stop at up to 15 intermediate stations.

Which operator is most reliable on this route?

Southern runs all direct services from Epsom Downs to Banstead. Over the last 30 days, 90.5% of Southern's services on this route ran on time, with an average delay of 0.5 minutes and a cancellation rate of 0.9%.

Why take the train?

The straight-line distance from Epsom Downs to Banstead is around 1 miles. By train the journey takes 00:03; the equivalent drive is typically 32m to 33m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.3 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Southern
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Southern (GTR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:38 and the last at 23:48. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Epsom Downs