Skip to content

Filton Abbeywood → Yate

From
To
See if you're owed money for delays on this route

Live train times from Filton Abbeywood to Yate, with around 29 direct services per day and a fastest typical journey of 12m. Operated by Great Western Railway. Currently 33.3% of services are running on time today.

Great Western Railway
First train
06:15
Last train
22:54
Fastest
12m
~29services per day

Based on the last 29 days of timetable data

00040812162023
Peak: 07–19:00 (~2/hr) · 21:00 (~2/hr)

Today's performance

3 services
1 on time · 2 delayed · 0 cancelled

28-day performance

824 services
434 on time · 353 delayed · 37 cancelled
Worst: 30 Oct (64.5% delayed)Best: 9 Nov (80.6% on time)
Based on 824 services over 28 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Filton Abbeywood to Yate are non-stop on the fastest services, taking 00:12. Most services call at one or two of Ashley Down, Bristol Temple Meads, Lawrence Hill. Slow services (00:16 typical) stop at up to 4 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs all direct services from Filton Abbeywood to Yate. Over the last 30 days, 46.5% of Great Western Railway's services on this route ran on time, with an average delay of 3.6 minutes and a cancellation rate of 4.5%.

Why take the train?

The straight-line distance from Filton Abbeywood to Yate is around 6 miles. By train the journey takes 00:12; the equivalent drive is typically 42m to 47m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.3 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 1.7 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:15 and the last at 22:54. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Filton Abbeywood