Skip to content

King's Lynn → Waterbeach

From
To
See if you're owed money for delays on this route

Live train times from King's Lynn to Waterbeach, with around 25 direct services per day and a fastest typical journey of 45m. Operated by Great Northern. Currently 82.4% of services are running on time today.

Great Northern
First train
04:45
Last train
22:45
Fastest
45m
~25services per day

Based on the last 29 days of timetable data

00040812162023
Peak: 05–08:00 (~2/hr) · 17–20:00 (~2/hr)

Today's performance

17 services
14 on time · 3 delayed · 0 cancelled

28-day performance

709 services
268 on time · 379 delayed · 62 cancelled
Worst: 25 Oct (87.5% delayed)Best: 11 Nov (59.3% on time)
Based on 709 services over 28 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from King's Lynn to Waterbeach are non-stop on the fastest services, taking 00:45. Most services call at one or two of London Kings Cross, Littleport, Cambridge. Some services extend to Cambridge North, Cambridge South, Watlington, Downham Market, Ely, Royston. Slow services (00:50 typical) stop at up to 15 intermediate stations.

Which operator is most reliable on this route?

Great Northern runs all direct services from King's Lynn to Waterbeach. Over the last 30 days, 44.3% of Great Northern's services on this route ran on time, with an average delay of 4.9 minutes and a cancellation rate of 9.1%.

Why take the train?

The straight-line distance from King's Lynn to Waterbeach is around 35 miles. By train the journey takes 00:45; the equivalent drive is typically 1h 40m to 2h 09m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 2 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 9.6 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Northern
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Northern (GTR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 04:45 and the last at 22:45. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from King's Lynn