Skip to content

Looe → Liskeard

From
To
See if you're owed money for delays on this route

Live train times from Looe to Liskeard, with around 13 direct services per day and a fastest typical journey of 21m. Operated by Great Western Railway. Currently 100% of services are running on time today.

Great Western Railway
First train
07:31
Last train
21:55
Fastest
21m
~13services per day

Based on the last 30 days of timetable data

00040812162023

Today's performance

7 services
7 on time · 0 delayed · 0 cancelled

29-day performance

364 services
319 on time · 22 delayed · 23 cancelled
Worst: 12 Nov (30.8% delayed)Best: 21 Oct (100% on time)
Based on 364 services over 29 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Looe to Liskeard are non-stop on the fastest services, taking 00:21. Most services call at one or two of Causeland, Sandplace, St Keyne Wishing Well Halt. Slow services (00:31 typical) stop at up to 4 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs all direct services from Looe to Liskeard. Over the last 30 days, 92.3% of Great Western Railway's services on this route ran on time, with an average delay of -0.9 minutes and a cancellation rate of 5.1%.

Why take the train?

The straight-line distance from Looe to Liskeard is around 6 miles. By train the journey takes 00:21; the equivalent drive is typically 42m to 47m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.3 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 1.7 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Great Western Railway services from Looe to Liskeard can be busy around 09:00. Avoid the 09:00 peak if you can. The 00:00–04:00 services are typically 28% less crowded. Off-peak return tickets are valid on any train after 09:30 on weekdays, all day weekends. The first train is at 07:31 and the last at 21:55. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Looe