Skip to content

Marlow → Furze Platt

From
To
See if you're owed money for delays on this route

Live train times from Marlow to Furze Platt, with around 13 direct services per day and a fastest typical journey of 18m. Operated by Great Western Railway. Currently 100% of services are running on time today.

Great Western Railway
First train
00:07
Last train
23:03
Fastest
18m
~13services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 10:00 (~2/hr) · 13:00 (~2/hr)

Today's performance

7 services
7 on time · 0 delayed · 0 cancelled

30-day performance

391 services
322 on time · 50 delayed · 19 cancelled
Worst: 10 Nov (41.7% delayed)Best: 27 Oct (75% on time)
Based on 391 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Marlow to Furze Platt are non-stop on the fastest services, taking 00:18. Most services call at one or two of Bourne End, Cookham, Maidenhead. Slow services (00:25 typical) stop at up to 3 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs all direct services from Marlow to Furze Platt. Over the last 30 days, 80.4% of Great Western Railway's services on this route ran on time, with an average delay of 1 minute and a cancellation rate of 0%.

Why take the train?

The straight-line distance from Marlow to Furze Platt is around 3 miles. By train the journey takes 00:18; the equivalent drive is typically 36m to 39m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.2 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.8 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 00:07 and the last at 23:03. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Marlow