Skip to content

Minster_(thanet) → Thanet Parkway

From
To
See if you're owed money for delays on this route

Live train times from Minster_(thanet) to Thanet Parkway, with around 20 direct services per day and a fastest typical journey of 3m. Operated by Southeastern. Currently 87.5% of services are running on time today.

Southeastern
First train
00:35
Last train
23:38
Fastest
3m
~20services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 07:00 (~2/hr) · 16:00 (~2/hr) · 19–20:00 (~2/hr)

Today's performance

16 services
14 on time · 2 delayed · 0 cancelled

30-day performance

599 services
167 on time · 418 delayed · 14 cancelled
Worst: 14 Nov (88.9% delayed)Best: 31 Oct (50% on time)
Based on 599 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Minster_(thanet) to Thanet Parkway are non-stop on the fastest services, taking 00:03. Most services call at one or two of Ashford International, Barming, Bromley South. Slow services (00:06 typical) stop at up to 20 intermediate stations.

Which operator is most reliable on this route?

Southeastern runs all direct services from Minster_(thanet) to Thanet Parkway. Over the last 30 days, 25% of Southeastern's services on this route ran on time, with an average delay of 9.2 minutes and a cancellation rate of 1.4%.

Why take the train?

The straight-line distance from Minster_(thanet) to Thanet Parkway is around 2 miles. By train the journey takes 00:03; the equivalent drive is typically 34m to 35m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.5 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Southeastern
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Southeastern operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 00:35 and the last at 23:38. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Minster_(thanet)