Skip to content

Par → Redruth

From
To
See if you're owed money for delays on this route

Live train times from Par to Redruth, with around 29 direct services per day and a fastest typical journey of 34m. Operated by Great Western Railway and CrossCountry. Currently 93.3% of services are running on time today.

Great Western RailwayCrossCountry
First train
06:05
Last train
23:38
Fastest
34m
~29services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 06:00 (~2/hr) · 08–12:00 (~2/hr) · 14–19:00 (~2/hr) · 22:00 (~2/hr)

Today's performance

15 services
14 on time · 1 delayed · 0 cancelled

30-day performance

862 services
199 on time · 605 delayed · 58 cancelled
Worst: 14 Nov (91.7% delayed)Best: 12 Nov (53.3% on time)
Based on 862 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Par to Redruth are non-stop on the fastest services, taking 00:34. Most services call at one or two of Newquay, Quintrell Downs, Bugle. Some services extend to Luxulyan, Roche, St Columb Road. Slow services (00:39 typical) stop at up to 6 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs the majority of direct services from Par to Redruth. Over the last 30 days, 22.4% of Great Western Railway's services on this route ran on time, with an average delay of 11.6 minutes and a cancellation rate of 5.9%. CrossCountry sees lower on-time performance (22.4%) but runs fewer services.

Why take the train?

The straight-line distance from Par to Redruth is around 25 miles. By train the journey takes 00:34; the equivalent drive is typically 1h 19m to 1h 39m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.4 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 6.7 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
CrossCountry
30–59 min: 50%60+ min: 100%

DR30 operators only pay out from 30+ minutes.

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:05 and the last at 23:38. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Par