Skip to content

Stevenage → City Thameslink

From
To
See if you're owed money for delays on this route

Live train times from Stevenage to City Thameslink, with around 62 direct services per day and a fastest typical journey of 34m. Operated by Thameslink. Currently 80% of services are running on time today.

Thameslink
First train
05:13
Last train
22:17
Fastest
34m
~62services per day

Based on the last 27 days of timetable data

00040812162023
Peak: 05–21:00 (~4/hr)

Today's performance

20 services
16 on time · 4 delayed · 0 cancelled

26-day performance

1620 services
736 on time · 672 delayed · 212 cancelled
Worst: 2 Nov (69.7% delayed)Best: 23 Oct (34.8% on time)
Based on 1,620 services over 26 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Stevenage to City Thameslink are non-stop on the fastest services, taking 00:34. Most services call at one or two of Alexandra Palace, Cuffley, Enfield Chase. Some services extend to Grange Park, Moorgate, Bayford, Bowes Park, Old Street, Crews Hill, Drayton Park, Highbury & Islington, Essex Road, Watton-at-Stone. Slow services (00:36 typical) stop at up to 20 intermediate stations.

Which operator is most reliable on this route?

Thameslink runs all direct services from Stevenage to City Thameslink. Over the last 30 days, 43.5% of Thameslink's services on this route ran on time, with an average delay of 5.2 minutes and a cancellation rate of 17.8%.

Why take the train?

The straight-line distance from Stevenage to City Thameslink is around 27 miles. By train the journey takes 00:34; the equivalent drive is typically 1h 25m to 1h 46m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.5 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 7.4 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Thameslink
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Thameslink (GTR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 05:13 and the last at 22:17. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Stevenage