Skip to content

Uckfield → Oxted

From
To
See if you're owed money for delays on this route

Live train times from Uckfield to Oxted, with around 17 direct services per day and a fastest typical journey of 40m. Operated by Southern. Currently 100% of services are running on time today.

Southern
First train
05:31
Last train
22:34
Fastest
40m
~17services per day

Based on the last 30 days of timetable data

00040812162023
Peak: 07:00 (~2/hr)

Today's performance

17 services
17 on time · 0 delayed · 0 cancelled

29-day performance

502 services
147 on time · 345 delayed · 10 cancelled
Worst: 23 Oct (100% delayed)Best: 20 Nov (73.7% on time)
Based on 502 services over 29 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Uckfield to Oxted are non-stop on the fastest services, taking 00:40. Most services call at one or two of Ashurst, Buxted, Crowborough. Some services extend to Cowden, Edenbridge Town, East Croydon, Eridge, Hever, Hurst Green, London Bridge. Slow services (01:46 typical) stop at up to 10 intermediate stations.

Which operator is most reliable on this route?

Southern runs all direct services from Uckfield to Oxted. Over the last 30 days, 56.3% of Southern's services on this route ran on time, with an average delay of 2.1 minutes and a cancellation rate of 0.8%.

Why take the train?

The straight-line distance from Uckfield to Oxted is around 20 miles. By train the journey takes 00:40; the equivalent drive is typically 1h 11m to 1h 28m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 1.2 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 5.6 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Southern
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Southern (GTR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Southern services from Uckfield to Oxted can be busy around 16:00–19:00. Avoid the 16:00–19:00 peak if you can. The 00:00–04:00 services are typically 28% less crowded. Off-peak return tickets are valid on any train after 09:30 on weekdays, all day weekends. The first train is at 05:31 and the last at 22:34. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Uckfield