Skip to content

Windsor & Eton Riverside → Datchet

From
To
See if you're owed money for delays on this route

Live train times from Windsor & Eton Riverside to Datchet, with around 35 direct services per day and a fastest typical journey of 4m. Operated by South Western Railway. Currently 100% of services are running on time today.

South Western Railway
First train
00:01
Last train
23:55
Fastest
4m
~35services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 06–23:00 (~2/hr)

Today's performance

13 services
13 on time · 0 delayed · 0 cancelled

30-day performance

1055 services
985 on time · 41 delayed · 29 cancelled
Worst: 24 Oct (20% delayed)Best: 26 Oct (100% on time)
Based on 1,055 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Windsor & Eton Riverside to Datchet are non-stop on the fastest services, taking 00:04. Most services call at one or two of Staines, Wraysbury, Sunnymeads. Some services extend to Putney, Richmond, Twickenham, Vauxhall, London Waterloo, Ashford (Surrey), Whitton, Clapham Junction, Feltham. Slow services (00:04 typical) stop at up to 12 intermediate stations.

Which operator is most reliable on this route?

South Western Railway runs all direct services from Windsor & Eton Riverside to Datchet. Over the last 30 days, 95.7% of South Western Railway's services on this route ran on time, with an average delay of 0.3 minutes and a cancellation rate of 0.8%.

Why take the train?

The straight-line distance from Windsor & Eton Riverside to Datchet is around 1 miles. By train the journey takes 00:04; the equivalent drive is typically 32m to 33m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.1 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 0.3 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

South Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. South Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 00:01 and the last at 23:55. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Windsor & Eton Riverside