Live train times from Walsall to Hamstead, with around 33 direct services per day and a fastest typical journey of 10m. Operated by LNR & WMR. Currently 100% of services are running on time today.

LNR & WMR
First train
06:02
Last train
23:42
Fastest
10m
~33services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 06–23:00 (~2/hr)

Today's performance

13 services
13 on time · 0 delayed · 0 cancelled

30-day performance

998 services
807 on time · 177 delayed · 14 cancelled
Worst: 22 Oct (33.3% delayed)Best: 23 Oct (97.2% on time)
Based on 998 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Walsall to Hamstead are non-stop on the fastest services, taking 00:10. Most services call at one or two of Birmingham New Street, Duddeston, Aston. Some services extend to Bescot Stadium, Tame Bridge Parkway, Perry Barr, Witton, Wolverhampton, Coseley, Dudley Port, Sandwell & Dudley, Smethwick Galton Bridge, Smethwick Rolfe Street, Tipton. Slow services (00:11 typical) stop at up to 20 intermediate stations.

Which operator is most reliable on this route?

LNR & WMR runs all direct services from Walsall to Hamstead. Over the last 30 days, 79.7% of LNR & WMR's services on this route ran on time, with an average delay of 0.8 minutes and a cancellation rate of 3.9%.

Why take the train?

The straight-line distance from Walsall to Hamstead is around 4 miles. By train the journey takes 00:10; the equivalent drive is typically 39m to 42m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.2 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 1.2 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

LNR & WMR
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. West Midlands Trains (LNR & WMR) operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:02 and the last at 23:42. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.