Skip to content

Boston → Radcliffe (nottinghamshire)

From
To
See if you're owed money for delays on this route

Live train times from Boston to Radcliffe (nottinghamshire), with around 15 direct services per day and a fastest typical journey of 1h 18m. Operated by East Midlands Railway. Currently 100% of services are running on time today.

East Midlands Railway
First train
06:13
Last train
20:54
Fastest
1h 18m
~15services per day

Based on the last 27 days of timetable data

00040812162023

Today's performance

13 services
13 on time · 0 delayed · 0 cancelled

26-day performance

378 services
148 on time · 224 delayed · 6 cancelled
Worst: 23 Oct (86.7% delayed)Best: 11 Nov (66.7% on time)
Based on 378 services over 26 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Boston to Radcliffe (nottinghamshire) are non-stop on the fastest services, taking 01:18. Most services call at one or two of Aslockton, Ancaster, Bingham. Some services extend to Bottesford, Grantham, Heckington, Netherfield, Nottingham, Rauceby, Skegness, Sleaford, Wainfleet. Slow services (01:28 typical) stop at up to 12 intermediate stations.

Which operator is most reliable on this route?

East Midlands Railway runs all direct services from Boston to Radcliffe (nottinghamshire). Over the last 30 days, 36% of East Midlands Railway's services on this route ran on time, with an average delay of 5.8 minutes and a cancellation rate of 2.7%.

Why take the train?

The straight-line distance from Boston to Radcliffe (nottinghamshire) is around 42 miles. By train the journey takes 01:18; the equivalent drive is typically 1h 54m to 2h 28m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 2.4 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 11.5 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

East Midlands Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. East Midlands Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:13 and the last at 20:54. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Boston