Skip to content

Eastleigh → Romsey

From
To
See if you're owed money for delays on this route

Live train times from Eastleigh to Romsey, with around 34 direct services per day and a fastest typical journey of 12m. Operated by Great Western Railway and South Western Railway. Currently 91.3% of services are running on time today.

Great Western RailwaySouth Western Railway
First train
06:12
Last train
23:45
Fastest
12m
~34services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 22:00 (~3/hr)

Today's performance

23 services
21 on time · 2 delayed · 0 cancelled

30-day performance

1032 services
371 on time · 645 delayed · 16 cancelled
Worst: 21 Oct (91.9% delayed)Best: 1 Nov (62.5% on time)
Based on 1,032 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Eastleigh to Romsey are non-stop on the fastest services, taking 00:12. Most services call at one or two of Botley, Cosham, Fareham. Slow services (00:33 typical) stop at up to 9 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs the majority of direct services from Eastleigh to Romsey. Over the last 30 days, 31.7% of Great Western Railway's services on this route ran on time, with an average delay of 4.3 minutes and a cancellation rate of 1.6%. South Western Railway sees lower on-time performance (31.7%) but runs fewer services.

Why take the train?

The straight-line distance from Eastleigh to Romsey is around 6 miles. By train the journey takes 00:12; the equivalent drive is typically 43m to 48m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.4 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 1.8 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
South Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 06:12 and the last at 23:45. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Eastleigh