Skip to content

Eastleigh → Southampton Central

From
To
See if you're owed money for delays on this route

Live train times from Eastleigh to Southampton Central, with around 41 direct services per day and a fastest typical journey of 10m. Operated by Great Western Railway, Southern and others. Currently 85.7% of services are running on time today.

Great Western RailwaySouthernSouth Western RailwayCrossCountry
First train
00:02
Last train
23:59
Fastest
10m
~41services per day

Based on the last 31 days of timetable data

00040812162023
Peak: 08:00 (~3/hr) · 13:00 (~3/hr) · 16:00 (~3/hr) · 18:00 (~3/hr)

Today's performance

14 services
12 on time · 2 delayed · 0 cancelled

30-day performance

1229 services
724 on time · 473 delayed · 32 cancelled
Worst: 13 Nov (73.7% delayed)Best: 25 Oct (98.5% on time)
Based on 1,229 services over 30 days

Travelling at a specific time? Check how direct trains around that departure usually run.

Typical calling pattern

Trains from Eastleigh to Southampton Central are non-stop on the fastest services, taking 00:10. Most services call at one or two of Botley, Cosham, Fareham. Slow services (00:30 typical) stop at up to 9 intermediate stations.

Which operator is most reliable on this route?

Great Western Railway runs the majority of direct services from Eastleigh to Southampton Central. Over the last 30 days, 48.9% of Great Western Railway's services on this route ran on time, with an average delay of 3.4 minutes and a cancellation rate of 1.5%. Southern sees lower on-time performance (48.9%) but runs fewer services.

Why take the train?

The straight-line distance from Eastleigh to Southampton Central is around 5 miles. By train the journey takes 00:10; the equivalent drive is typically 40m to 44m depending on traffic, plus 30 minutes of city-centre parking. National Rail publishes average CO₂ emissions of ~35g per passenger-km for electric intercity trains. For this route that's roughly 0.3 kg CO₂ per passenger. The same trip in a petrol car with one occupant emits around 1.4 kg. Two passengers by train equals the per-person footprint of one passenger by car.

Delay Repay

Great Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
Southern
15–29 min: 25%30–59 min: 50%60+ min: 100%
South Western Railway
15–29 min: 25%30–59 min: 50%60+ min: 100%
CrossCountry
30–59 min: 50%60+ min: 100%

DR30 operators only pay out from 30+ minutes.

Delay Repay for this route

All operators on this route offer delay compensation. Great Western Railway operates the DR15 scheme (15–29 min: 25%, 30–59 min: 50%, 60+ min: 100%). Claims can be made within 28 days of travel. Use Railly's Delay Repay calculator to check eligibility and pre-fill the operator's claim form.

Travel tips for this route

Off-peak return tickets are valid on any train after 09:30 on weekdays, all day on weekends. The first train is at 00:02 and the last at 23:59. If your train is delayed by 15 minutes or more, you can claim Delay Repay compensation directly from the operator.

Another journey from Eastleigh